Basement Demolition- ongoing


Pulling up the floor and taking down drywall from walls and ceiling. Next step here will be to raise a ceiling beam up into the first story floor joists, and provide access to the plumber, HVAC and electrician. Eventually this will be a studio office with kitchen and bath.

IMG_3470 IMG_3471 IMG_3476IMG_1136 IMG_1137 IMG_1140 IMG_1142IMG_1146 IMG_1149 IMG_1155 IMG_1157 IMG_1158 IMG_1159 IMG_1160 IMG_1162 IMG_1163 IMG_1166 IMG_1167 IMG_1168IMG_3489 IMG_3490 IMG_3491 IMG_3498 IMG_3499 IMG_3501


Leave a Reply

Your email address will not be published.